Net metering Arizona: Az Utility Export Rate Table
The Az Utility Export Rate Table carries 1 published figure read from 2 sources' own pages, from 10 to 10 year, read 11 October 2026.
2 of the 11 named sources read in full publish a figure; 9 publish none, read 11 October 2026.
By rule
| Breakdown | Median | Range | Sources |
|---|---|---|---|
| ruleexport rate lock-in term at interconnection | 10year | 10 to 10year | 1 |
| ruleTEP Resource Comparison Proxy export rate | 0.06USD | 0.06 to 0.06USD | 1 |
| ruleregulator's cap on the annual step-down | 10% | 10 to 10% | 1 |
Every figure, with its source
One row per source: the figure the source's own page publishes, the page, and the day it was read. A figure that is not on a page we read is not on this one.
| Source | Figure | Breakdown | Read |
|---|---|---|---|
| TEP Resource Comparison Proxy export rate | 10year | export rate lock-in term at interconnection | 2026-10-11 |
| TEP Resource Comparison Proxy export rate | 10% | regulator's cap on the annual step-down | 2026-10-11 |
| SRP compare solar price plans | 3.45cents | 2026-10-11 | |
| TEP Resource Comparison Proxy export rate | 0.06USD | TEP Resource Comparison Proxy export rate | 2026-10-11 |
The sentence each figure was read from (4)
- TEP Resource Comparison Proxy export rate, read 2026-10-11:
The rate is usually adjusted annually, but customers are compensated for up to 10 years at the RCP export rate in place at the time they requested interconnection of a new solar power system.
- TEP Resource Comparison Proxy export rate, read 2026-10-11:
However, the RCP will not be allowed to fall more than 10 percent annually.
- SRP compare solar price plans, read 2026-10-11:
Any excess energy you generate will be instantly exported by SRP and credited to your bill at a fixed price of 3.45 cents per kilowatt-hour (kWh).
- TEP Resource Comparison Proxy export rate, read 2026-10-11:
An energy export rate of $0.0570 per kWh will remain in effect from October 1, 2024 through September 30, 2025.
Read in full, publishes no figure
9 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.
- TEP net metering, read 2026-10-11: every candidate on the page was refused
- TEP 2026 rates, read 2026-10-11: every candidate on the page was refused
- SRP time-of-use export price plan, read 2026-10-11: every candidate on the page was refused
- SRP renewable export program, read 2026-10-11: every candidate on the page was refused
- APS renewable energy riders, read 2026-09-11: read in full and no accepted figure on the page
- APS understanding solar, read 2026-09-11: read in full and no accepted figure on the page
- Arizona Corporation Commission, read 2026-10-11: read in full and no accepted figure on the page
- Arizona Corporation Commission Utilities Division, read 2026-09-11: read in full and no accepted figure on the page
- APS Rate Rider RCP rate schedule, read 2026-10-11: read in full and no accepted figure on the page
Methodology
Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).
2 of the 11 named sources that could be read published a usable figure; 9 published none and are recorded as not published, never filled in; 1 could not be read (blocked, dead or unreachable) and count nowhere.
The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in year (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 22 candidate sentence(s) were refused by a reviewer with the reason recorded.
The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per utility per plan per year: the export credit in cents per kWh, the plan it attaches to, the lock-in term the customer gets at interconnection, the annual step-down and the regulator's cap on it, plus the fixed charges and demand charge that decide what the exported credit is actually worth.
The derivation is the SERIES and the LOCK: the export rate by utility by year since the Arizona Corporation Commission replaced full-retail net metering with the Resource Comparison Proxy, and what a system interconnected in each of those years is still being paid today - which is the difference between a payback figure that is right and one that is two rate years stale.
Nobody publishes that series across APS, SRP and TEP together; each utility publishes only its own current number.
22 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.
Sources (12)
- TEP Resource Comparison Proxy export rate(the publisher's own terms; quoted for reporting and comment)
- TEP net metering(the publisher's own terms; quoted for reporting and comment)
- TEP 2026 rates(the publisher's own terms; quoted for reporting and comment)
- SRP compare solar price plans(the publisher's own terms; quoted for reporting and comment)
- SRP time-of-use export price plan(the publisher's own terms; quoted for reporting and comment)
- SRP renewable export program(the publisher's own terms; quoted for reporting and comment)
- APS renewable energy riders(the publisher's own terms; quoted for reporting and comment)
- APS understanding solar(the publisher's own terms; quoted for reporting and comment)
- Arizona Corporation Commission(the publisher's own terms; quoted for reporting and comment)
- Arizona Corporation Commission Utilities Division(the publisher's own terms; quoted for reporting and comment)
- APS Rate Rider RCP rate schedule(the publisher's own terms; quoted for reporting and comment)
- ACC eDocket filing (value-of-solar record)(the publisher's own terms; quoted for reporting and comment)
Cite or embed this figure
The Az Utility Export Rate Table carries 1 published figure read from 2 sources' own pages, from 10 to 10 year, read 11 October 2026.
2 of the 11 named sources read in full publish a figure; 9 publish none, read 11 October 2026.
Az Utility Export Rate Table, rule export rate lock-in term at interconnection: median 10 year across 1 source, read 11 October 2026.
Az Utility Export Rate Table, rule TEP Resource Comparison Proxy export rate: median 0.06 USD across 1 source, read 11 October 2026.
Az Utility Export Rate Table, rule regulator's cap on the annual step-down: median 10 percent across 1 source, read 11 October 2026.
Cite as: "arizonasolarcostcalculator.com Az Utility Export Rate Table", updated 2026-10-18, https://arizonasolarcostcalculator.com/datasets/az-utility-export-rate-table/.
Download the CSV (4 rows, computed 2026-10-18)